Wednesday, December 22, 2010

In with the New

Once the old genny's were out the new ones were installed. We've replaced four small Frichs and two large B&W generators with four newer machines that run on heavy fuel oil (HFO), which is a LOT cheaper than the light diesel fuel we used to use (and is still used for the main engines).

So not only do we have four new machines with all the pipework and wiring to sort out, but a whole new fuel system with associated tanks, valves, pipes etc to install as well. The pipework has been one of the hardest and most time consuming aspects of the project so far - and the bottom picture gives you a good idea why it is so hard to sort out. Every pipe has to be shaped to fit around the other systems already in place. For those of you who've worked in engine rooms on ships (or submarines) the challenges will be very familiar!! I have many vivid memories of crawling around pipework on boats and ships trying to get pipes in and out during maintenance periods whilst in the Royal Navy.

Makes me glad to be a desk jockey!





1 comment:

Anonymous said...

We ptay all goes well for the engineers